Temporary Flood Barrier

0
2χλμ.

Waterproof Greatly Improved
The addition of the front P-shape EPDM seal increases the waterproof performance by 50% and significantly reduces the water leakage which reaches the standard of Japan’s Class 1 waterproof equipment.

Structure Significantly Strengthened
The 1st generation of board joints were at 90° angles and were easily damaged due to stress concentration. We have changed the shape of the joint surface of the board to a folded angle, thus dispersing the stress and significantly improving the structural strength.

Free Standing Flood Board

New Stainless Steel Locking Clamp Design
A stainless steel locking clamp is new provided on the board, to lock each connecting board. The 1st generation was buckled together directly by the slotted channel in the board, due to the low strength of the plastic material offering un-sufficient locking strength, in extreme cases these buckles may slip out leads to a risk of failure.
The new stainless steel locking design makes the connection more stable, and doubled the overall rigidity of the full system.

Contacting Interface Reinforced
Reinforcing bracket with the seals is designed at the contacting interface to prevent damage and extend the life.

Storage Space Reduced
The boards can be stored in two or three pieces connected and placed on its side, to reduce the storage area. And the assembled form can reduce the transporting and deploy time for emergency.

Free Standing Temparary Flood Barrier Deployment

1、Confirm the site for deployment
2、Clean the gound of the site
3、Stand behind the flood board to place the front of the board facing the water
4、Set the first left board(FG、FGL) as initial at the wet side.
5、Connect the following to the right end.
6、Apply the right board(FG、FGR) to tightly connect the wall at right side

Αναζήτηση
Κατηγορίες
Διαβάζω περισσότερα
Health
Stromectol (Ivermectin) Dosage for Scabies
  stromectol 3 mg (ivermectin) is an oral antiparasitic medication sometimes used to treat...
από GessikaZytcher 2025-03-26 09:32:50 0 144
Κεντρική Σελίδα
bodrum istanbul izmir bursa antalya evden eve nakliyat
Bodrum ve İstanbul'da olmak üzere, Türkiye'nin tüm illerine evden eve nakliye ve...
από damla 2024-08-18 15:08:00 0 2χλμ.
άλλο
Ammonia decomposition catalyst support
Ammonia decomposition catalyst support ZZC-946 Physical Parameter No. Item Value...
από miawuxi2023 2025-02-10 02:01:55 0 672
άλλο
The Role of Skid-Mounted Units in Water Treatment and Purification Systems
Skid-mounted units have become a pivotal component in modern water treatment and purification...
από miawuxi2023 2024-11-05 01:11:45 0 1χλμ.
άλλο
HAPPY Black Indigenous People Day!
https://images.app.goo.gl/cYAN3Cvu3FUp9ntt7 Black American Indians! We Were here before Columbus!
από BeulahO 2024-10-15 04:20:38 0 2χλμ.