Bridge Crane for Hydropower Industry
Posted 2025-04-16 01:41:35
0
77
Bridge Crane for Hydropower Industry
(1) With no-trolley-frame structure, the height of trolley for large-tonnage bridge crane is reduced by more than 1.5m, and the workshop space is larger; the dead weight of the whole crane is about 15%-30% lighter than the general purpose bridge crane, and the wheel load is low, which can save investment.
(2) The bridge structure and end beam are connected by pin shaft, which is convenient for transportation and installation.
(3) The hoisting and travelling mechanisms both adopt frequency conversion speed regulation, PLC control, with high reliability and low failure rate.
(4) Having the largest dynamic load test bench for trolley and static load test bench for bridge structure.
Cerca
Categorie
- Art
- Causes
- Crafts
- Dance
- Drinks
- Film
- Fitness
- Food
- Giochi
- Gardening
- Health
- Home
- Literature
- Music
- Networking
- Altre informazioni
- Party
- Religion
- Shopping
- Sports
- Theater
- Wellness
Leggi tutto
MMOexp CUT 25 Coins: Market Trends Help Maximize Profits
In recent months, "College Football 25" (CFB 25) has introduced a series of engaging events and...
Effective Writing Strategies for Content Creation and Academic Essays
Engaging in writing content creation requires a thoughtful approach that goes beyond mere word...
Global Egg Powder Market Comprehensive Analysis and Forecast 2024 to 2030
The recent analytical report published by Markntel Advisors (a leading consulting, data...
What Are the Applications of Alumina Spherical Carriers?
Alumina spherical carriers, also known as alumina balls or beads, are widely used in various...
MMOexp: How to Get a Head Start After Entering the Game? - Best Currency Farming Tips
Welcome to the realm of Night Crows Diamonds, where exploration and adventure await at every...