Bridge Crane for Hydropower Industry
Posted 2025-04-16 01:41:35
0
77
Bridge Crane for Hydropower Industry
(1) With no-trolley-frame structure, the height of trolley for large-tonnage bridge crane is reduced by more than 1.5m, and the workshop space is larger; the dead weight of the whole crane is about 15%-30% lighter than the general purpose bridge crane, and the wheel load is low, which can save investment.
(2) The bridge structure and end beam are connected by pin shaft, which is convenient for transportation and installation.
(3) The hoisting and travelling mechanisms both adopt frequency conversion speed regulation, PLC control, with high reliability and low failure rate.
(4) Having the largest dynamic load test bench for trolley and static load test bench for bridge structure.
Zoeken
Categorieën
- Art
- Causes
- Crafts
- Dance
- Drinks
- Film
- Fitness
- Food
- Spellen
- Gardening
- Health
- Home
- Literature
- Music
- Networking
- Other
- Party
- Religion
- Shopping
- Sports
- Theater
- Wellness
Read More
Drill Pipe Market: Industry Analysis and Growth Forecast
Drill Pipe Market Analysis:
A comprehensive analysis of the drill pipe market involves...
2022 Buffalo Sabres Greatest 25 Down below 25, #11: Rasmus Asplund
The Ultimate 25 Underneath 25 is a collaboration by way of participants of the Die By way of The...
Why Is Using an Asthma Inhaler Important?
Asthma is a common chronic respiratory condition that affects millions worldwide. It can lead to...
Multifunctional Punching Machines: The Key to Streamlining Your Production Process
In the ever-evolving landscape of manufacturing, efficiency and precision are...
Asia-Pacific FSRU Market: Opportunities in the Expanding LNG Sector
Asia-Pacific FSRU Market Overview:
The Asia-Pacific region is witnessing a significant shift in...