Bridge Crane for Hydropower Industry
Posted 2025-03-28 02:07:43
0
504
Bridge Crane for Hydropower Industry
(1) With no-trolley-frame structure, the height of trolley for large-tonnage bridge crane is reduced by more than 1.5m, and the workshop space is larger; the dead weight of the whole crane is about 15%-30% lighter than the general purpose bridge crane, and the wheel load is low, which can save investment.
(2) The bridge structure and end beam are connected by pin shaft, which is convenient for transportation and installation.
(3) The hoisting and travelling mechanisms both adopt frequency conversion speed regulation, PLC control, with high reliability and low failure rate.
(4) Having the largest dynamic load test bench for trolley and static load test bench for bridge structure.
Search
Categories
- Art
- Causes
- Crafts
- Dance
- Drinks
- Film
- Fitness
- Food
- Games
- Gardening
- Health
- Home
- Literature
- Music
- Networking
- Other
- Party
- Religion
- Shopping
- Sports
- Theater
- Wellness
Read More
Flat Mask Machines: Key Components and Their Functions
In the wake of global health concerns, the demand for personal protective equipment (PPE) has...
Lithium Battery Additives: How They Work and Why They Matter
The demand for electric vehicles (EVs), renewable energy storage, and portable electronics is...
FC 25 Title Update 3 comes with a series of issue
Division Rivals is another avenue, resembling real soccer divisions where you aim to climb higher...
CSK vs SRH IPL 2025 Betting Tips and Prediction – Trusted Insights on Cricaza
The vital IPL 2025 contest between Chennai Super Kings (CSK) and Sunrisers Hyderabad (SRH)...
Exploring GCC Water Treatment Equipment Market Opportunity, Latest Trends, Demand, and Development By 2030
MarkNtel Advisors recently published a detailed industry analysis of the GCC Water Treatment...
© 2025 Sikhona Social
English
