Bridge Crane for Hydropower Industry
Δημοσιευμένα 2025-03-28 02:07:43
0
140
Bridge Crane for Hydropower Industry
(1) With no-trolley-frame structure, the height of trolley for large-tonnage bridge crane is reduced by more than 1.5m, and the workshop space is larger; the dead weight of the whole crane is about 15%-30% lighter than the general purpose bridge crane, and the wheel load is low, which can save investment.
(2) The bridge structure and end beam are connected by pin shaft, which is convenient for transportation and installation.
(3) The hoisting and travelling mechanisms both adopt frequency conversion speed regulation, PLC control, with high reliability and low failure rate.
(4) Having the largest dynamic load test bench for trolley and static load test bench for bridge structure.
Αναζήτηση
Κατηγορίες
- Art
- Causes
- Crafts
- Dance
- Drinks
- Film
- Fitness
- Food
- Παιχνίδια
- Gardening
- Health
- Κεντρική Σελίδα
- Literature
- Music
- Networking
- άλλο
- Party
- Religion
- Shopping
- Sports
- Theater
- Wellness
Διαβάζω περισσότερα
How a Mobile App Development Company Transformed My Business
As a business owner, I knew that staying competitive in today’s digital world required more...
HAISHUN Jacketed Kettles: Reliable Solutions for Industrial Cooking and Mixing
In the fast-paced world of food processing and industrial cooking, efficiency, consistency, and...
Power Cables for Power Transmission & Distribution: Innovations and Applications
Power Cables for Power Transmission and Distribution Market
Introduction: The Power Cables...
What is Sodium Polyacrylate and its uses?
Sodium polyacrylate is a superabsorbent polymer that has gained significant attention due to its...
Use Quality Source To Gain Information About Business Blog
Health blogs can be used to disseminate information as well as assist individuals with their...