Bridge Crane for Hydropower Industry
Posted 2025-03-28 02:07:43
0
142
Bridge Crane for Hydropower Industry
(1) With no-trolley-frame structure, the height of trolley for large-tonnage bridge crane is reduced by more than 1.5m, and the workshop space is larger; the dead weight of the whole crane is about 15%-30% lighter than the general purpose bridge crane, and the wheel load is low, which can save investment.
(2) The bridge structure and end beam are connected by pin shaft, which is convenient for transportation and installation.
(3) The hoisting and travelling mechanisms both adopt frequency conversion speed regulation, PLC control, with high reliability and low failure rate.
(4) Having the largest dynamic load test bench for trolley and static load test bench for bridge structure.
Search
Categories
- Art
- Causes
- Crafts
- Dance
- Drinks
- Film
- Fitness
- Food
- Games
- Gardening
- Health
- Home
- Literature
- Music
- Networking
- Other
- Party
- Religion
- Shopping
- Sports
- Theater
- Wellness
Read More
Dimethyl Carbonate Market Report: Unveiling the USD 3.7 Billion Opportunity by 2030
The Dimethyl Carbonate (DMC) Market is experiencing a period of significant expansion,...
North America Hydrogen Fuel Cells Market: Powering the Clean Energy Future
North America Hydrogen Fuel Cells Market
The North America Hydrogen Fuel Cells Market has been...
Minibus Hire with Driver in Rome: The Ideal Way to Explore the Eternal City
Traveling around Rome, a city rich in history, culture, and breathtaking sights, can be both...
Portland Managed IT
If you're looking for a provider of Portland managed IT, PavelComm delivers comprehensive support...
The Benefits of Regularly Brushing Your Pool with a Pool Brush
Having a pool is a wonderful luxury that provides endless hours of relaxation and enjoyment....
© 2025 Sikhona Social
English
