Bridge Crane for Hydropower Industry

0
142

Bridge Crane for Hydropower Industry

(1) With no-trolley-frame structure, the height of trolley for large-tonnage bridge crane is reduced by more than 1.5m, and the workshop space is larger; the dead weight of the whole crane is about 15%-30% lighter than the general purpose bridge crane, and the wheel load is low, which can save investment.

(2) The bridge structure and end beam are connected by pin shaft, which is convenient for transportation and installation.

(3) The hoisting and travelling mechanisms both adopt frequency conversion speed regulation, PLC control, with high reliability and low failure rate.

(4) Having the largest dynamic load test bench for trolley and static load test bench for bridge structure.

البحث
الأقسام
إقرأ المزيد
أخرى
Clean Development Mechanism Market Expands as Climate Goals Tighten
The Clean Development Mechanism (CDM) Market is emerging as a pivotal force in the...
بواسطة IntentMR 2025-03-07 13:47:47 0 404
الألعاب
MMOexp-Unlocking the Mystery of Night Crows Microtransactions: Worth the Splurge?
Welcome back to another episode of Blan Crypto! Today, we delve into the mysterious world of...
بواسطة Myramillan 2024-09-10 01:03:37 0 2كيلو بايت
الألعاب
入金不要のオンラインカジノボーナスを最大限に活用する方法 オンラインスロット
  カジノボーナスは、 オンラインスロット...
بواسطة aserty 2024-11-27 19:31:01 0 1كيلو بايت
أخرى
North America, Asia Pacific, and Beyond: Regional Insights into the Aluminum Beverage Can Market
The global Aluminum Beverage Can Market stands as a cornerstone of the modern packaging...
بواسطة IntentMR 2025-03-20 18:31:01 0 329
الألعاب
Παιχνίδια καζίνο και πάροχοι στο Casino Infinity GR
Το Casino Infinity είναι ένας από...
بواسطة slava 2025-02-25 18:59:55 0 636